Skip to main content
Climate
Search

Main navigation

  • Climate 101
    • What We Know
    • What Can Be Done
    • Climate Primer
  • Explore
    • Explainers
    • Ask MIT Climate
    • Podcast
    • For Educators
  • MIT Action
    • News
    • Events
    • Resources
  • Search
MIT

Main navigation

  • Climate 101
    • What We Know
    • What Can Be Done
    • Climate Primer
  • Explore
    • Explainers
    • Ask MIT Climate
    • Podcast
    • For Educators
  • MIT Action
    • News
    • Events
    • Resources
  • Search
PostApril 8, 2019

Paving ahead: Model aims for infrastructure preservation

In 2017, the American Society of Civil Engineer’s Infrastructure Report Card gave America’s infrastructure an overall grade of a D+. Given that the report found the U.S. had been paying for just half of its infrastructure needs, the low grade unfortunately wasn't surprising.

To solve the crisis, researchers Fengdi Guo, Jeremy Gregory, and Randolph Kirchain at the MIT Concrete Sustainability Hub have proposed a new approach to long-term infrastructure preservation. The approach, outlined in the Journal of the Transportation Research Board, is called simulation optimization life-cycle cost analysis (LCCA).

Like other long-term pavement preservation strategies, this new MIT method takes a life-cycle cost analysis perspective, involving factoring in the costs of future maintenance to the total cost of a project in addition to the initial costs of construction.

But what sets MIT’s simulation optimization LCCA apart from the other approaches is its embrace of various uncertainties, particularly related to the timing and treatment methods used to repair and rehabilitate pavements — known as the treatment schedule.

Currently, traditional long-term strategies employ a rigid schedule for future road treatments, explains Guo. “One drawback of a rigid schedule,” he says, “is that it may overestimate the total life-cycle cost.”

Such strategies also assume that predetermined investments or decisions will result in a predictable outcome — for example, that a planned investment in a highway will produce a corresponding future improvement in its performance and quality.

The MIT approach, however, acknowledges that this is often not the case.

Conditions like construction costs, maintenance costs, and deterioration processes can change unpredictably over the course of a project’s lifetime. This means that a set investment may not produce a set result, and — if pavements deteriorate faster than expected — may lead to unbudgeted repairs or even unsafe conditions.

To manage these uncertainties, MIT researchers assemble pricing, deterioration, and potential treatment schedule information to inform their predictions. They then predict the many possible future prices of asphalt and concrete — two key paving materials.

The next part of the process is what gives simulation optimization its name — an algorithm simulates numerous potential scenarios in pricing and deterioration from year to year.

“We have simulated around 1,000 scenarios and, for each scenario, the future cost and deterioration rate are fixed,” Guo says.

After completing the simulations, optimization then comes into play. “For each simulated scenario we can find an optimal treatment schedule,” says Guo, “and based on this schedule we can then calculate its life cycle costs.”

All of these simulated and then optimized results are then compiled to show the life cycle cost distribution of different pavement design alternatives. Based on these distributions, the best design is selected.

Essentially, this new method considers the uncertainty of both treatment timing and treatment actions to reduce a project’s life cycle cost. This results in different, more beneficial pavement designs.

And when compared to the costs of conventional methods, the advantages of simulation optimization become apparent.

In one case study of a mile-long length of road over a 35-year period, the simulation optimization model cost $150,000 less per mile than conventional methods when considering lifecycle cost.

The same is true of a road similar in length but with even more traffic flow. When the road saw nearly six times the truck traffic, the simulation optimization model cost $100,000 less per mile over its lifecycle.

At a time when funding for infrastructure is scarce, these case studies demonstrate that a simulation optimization model will allow agencies to make better informed paving decisions that will prove more cost effective over a pavement’s life cycle.

Concrete Sustainability Hub research is supported by the Portland Cement Association and the Ready Mixed Concrete Research and Education Foundation.

by MIT News
Topics
Cities & Planning
Climate Modeling
Finance & Economics
Industry & Manufacturing

Related Posts

PostJune 16, 2025

Lack of middleman between Illinois farmers and consumers limits market for ...

MIT Climate
A man laughs while carrying a white and green box that reads "farm fresh vegetables."
PostJune 12, 2025

A Complete Picture of Sustainability

MIT Spectrum
Example of a modeling map.
PostJune 12, 2025

Podcast episode: Digging into climate-smart dairy with Carolyn Beans

MIT Climate
A composite of two side-by-side images. On the left, a woman with a blue shirt smiles. On the right is the logo of the FarmHouse podcast: a flowerpot and a window, through which we can see a small building and windmill.
PostJune 11, 2025

A vision for transportation resilience in the energy transition

MIT Center for Sustainability Science and Strategy
Rethinking resilience of low-carbon transportation

MIT Climate News in Your Inbox

 
 

MIT Groups Log In

Log In

Footer

  • About
  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Contact
MIT Climate Project
MIT
Communicator Award Winner
Communicator Award Winner